1. According to the specifications of the anchoring agent and the length of the rod required by the design, determine that the drilling depth is 60~80mm longer than the full length of the rod
2. Use compressed air to clean the floating dust on the eyelets.
3. According to the designed anchoring length, use the rod body to feed the selected anchoring agent into the bottom of the hole, start the stirrer to drive the rod body to rotate for 30 ± 5 seconds, and push it evenly to the bottom of the hole.
4. After removing the mixer, timely wedge the rod body at the orifice, and do not shift or shake the rod body before curing. It is particularly important to install the top eye. It is advisable to test the anchoring force after a fast speed of 15 minutes and a medium speed of 40 minutes.
5. After 7 minutes and 15 minutes of fast and medium speed, the upper support plate can be loaded by tightening the nut.
6. According to the on-site power conditions, the mixing installation tool can use a pneumatic anchor rod mixer or an electric coal drill with a connecting head, and the nut can be tightened using a pneumatic or manual wrench. If a rock bolt drilling rig is used for operation, it is more convenient to drill and install the rock bolts on the same machine.
Editing And Broadcasting Of Resin Anchoring Agent Usage Methods
Jul 13, 2022
Leave a message
Send Inquiry

